Well I’ve managed to thoroughly stress myself out. In the process of new arena (and dry lot) construction. Grading and footing is all complete, but I think I may have a fencing issue. The base is compacted/graded clay-based soil, with 4" of limestone screenings on top. The entire area/pad is covered in the limestone (arena and dry lots are adjacent) and then the arena has 2" of sand as well. While I was waiting for the fencing crew to move in, we had a BIG rain and I’m seeing a fair bit of washout of my sand. Originally we were relying on materials and slopes (crowned) for water management and not going to put a kickboard in, but now I’m thinking a 2x6 may be necessary.
Is that just going to create a pond? Is it necessary evil? Should I put the 2x6 then backfill with gravel?? So close to finally having this project done and I’m worried the last stretch is going to mess it all up.